In 10 carts

Price: ₹ 163.000

Original Price: ₹ 572.000

50% off
New markdown! Biggest sale in 60+ days

Chandrayaan: -4 (pronunciation ⓘ

You can only make an offer when buying a single item

Add to cart

Chandrayaan -4 (pronunciation ⓘ; from Sanskrit: Chandra, "Moon" and yāna, "craft, vehicle") is a planned lunar sample return mission of ISRO and the fourth iteration in its Chandrayaan programme. [2][3] As of January 2025, the conceptualisation phase has been completed, and the design phase is nearing completion. [4] The mission is expected to launch around 2027. [5] It is planned to return up to 3 kg (6.6 lb) of lunar regolith from near Shiv Shakti point, the landing site of Chandrayaan -3 ... Chandrayaan -2 mission is a highly complex mission, which represents a significant technological leap compared to the previous missions of ISRO. It comprised an Orbiter, Lander and Rover to explore the unexplored South Pole of the Moon. The mission is designed to expand the lunar scientific knowledge through detailed study of topography, seismography, mineral identification and distribution, surface chemical composition, thermo-physical characteristics of top soil and composition of the ... Chandrayaan-1 (pronunciation ⓘ; from Sanskrit: Chandra, "Moon" and yāna, "craft, vehicle") [6] of the Chandrayaan programme, was the first Indian lunar probe. It was launched by ISRO in October 2008, and operated until August 2009. The mission consisted of an orbiter and an impactor. ISRO launched the spacecraft using a PSLV-XL (C-11) rocket on 22 October 2008 at 00:52 UTC from Satish Dhawan Space Centre (SDSC), at Sriharikota, Andhra Pradesh. [7] The mission was a major boost to India's ... The Chandrayaan programme consists of robotic explorers such as the Moon Impact Probe (MIP) an impactor, Chandrayaan -1 and 2 the orbiters, Vikram lander and Pragyaan rover.

4.9 out of 5

(2712 reviews)

5/5 Item quality
4/5 Shipping
4/5 Customer service
Loading